CSLB · coming soon
CSLB C-22 Asbestos Abatement course icon

CSLB C-22 Asbestos Abatement: Practice Questions, Units, and Exam Format

Containment setup and negative pressure, asbestos removal, encapsulation and disposal, decontamination, and Cal/OSHA records. See exactly what is on the exam, unit by unit, and practice it with a tutor that adapts to you.

Exam format

Structure of the CSLB C-22 Asbestos Abatement exam, from the official license examination study guide and examination FAQ.
SectionQuestionsTimeShare of score
CSLB C-22 Asbestos AbatementNot published3 hr 30 min100%

Units and exam weights

The 5 units of CSLB C-22 Asbestos Abatement, with the approximate exam weight its study guide gives each.
UnitExam weightTopics covered
Planning and Estimating15%Plans and specifications, Scope of work and project planning, Regulatory agency notification, Estimating materials, labor, equipment, and disposal
Containment Site Preparation27%Area notification, Containment setup, Utility isolation, Negative pressure
Asbestos Abatement Methods and Disposal27%Asbestos removal methods, Encapsulation and encasement, Contamination prevention and decontamination procedures, Asbestos-containing material disposal
Documentation9%Health records, Site activities, Cal/OSHA documentation requirements
Safety22%Personnel and job site safety, Personal protective equipment (PPE), Cal/OSHA safety requirements, Personnel training and certification requirements

How Kalyta teaches CSLB C-22 Asbestos Abatement

Practice that adapts to you, an explanation for every answer, and timed rehearsals before the real thing. You spend your time on the units that move your score instead of the ones you have already got.

Start free

One subscription covers every course in the CSLB app, so you can study more than one without paying twice.

Kalyta is an independent study tool and is not endorsed by or affiliated with the Contractors State License Board (CSLB) or the State of California.